DRAINAGE PROJECT COST ESTIMATES EXISTING CITY FIGURE 14 LOCATION WORK TO BE DONE ESTIMATED COST | re uni MANHOLES | TOTAL | SUBTRACT; NET ON LEN. | cost cost | EXPECTED; COST ! 950! (m) om) Ym) - {| (1962) GRANTS |.R. No.2 Boundary (McPerson 750 300 298,500 298,500 Broadway Kingsway 511] 1820x2400 | 2,195 1,129,000 1,129,000 Broadway Cameron 756| 1820x3048 | 2,629 2,000,000 2,000,000 Kingoway Broadway 1,300! Lining 1,109,000 4,109,000 Bypass Kingeway S. 1,900! Ditch imp. 289,000 289,000 z | PUMP STATIONS Mapie Creek 970,000 970,000 Pitt River Rd. 225,000 225,000 Harbour 877,500 877 500 TOE 6,896,000 | 6,898 ,000 25 % Engineering & Contingency 1,724,500 1,724 500 TOTAL DRAINAGE PROGRAM 2,822,500 | 8,622,500 DRAINAGE PROJECT COST ESTIMATES NORHTEAST SECTOR FIGURE 15 LOCATION WORK TO BE DONE ESTIMATED COST Ni Lr we SUBTRACT EXPECTED ON | FROM ops “rn cost GRANTS om) Dominion Lougheed Outfall RW Read B Dominion Fremort Nicola Dominion ‘ Otten Dominion Road B 294,000 RoadB Otewa Dominion 723,000 iGulvert Ditch & Pipa Work from Trenton prea 1,408,000 PUMP STATIONS Dominion Phase 1 z ie) 758,500 Dominion Phase 2 ! 970,000 — TOT ‘ 8,646 250 40 % Enginecring & Contingericy 0| 3,458,500 TOTAL DRAINAGE PROGRAM o| 12,104,750