THE CORPORATION OF THE CITY OF PORT COQUITLAM LR. Zahynacz, P.Eng. DATE: November 08, 1993 City Engineer Anne T. Pynenburg Project Technician REQUEST POR TRAFFIC IMPROVEMENTS AT HAZEL TREMBATH SCHOOL ; RECOMMENDATION: Tum down request for four-way stop at Eastem and Western Drives, Tum down request to install 4 crosswalks on each leg of intersection, Tum down request for flashing yellow lights adjacent to school zone signs. Install one “Playground Zone” sign with a 30km/h tab approx. 30m south of Eastern Dr. on Western Dr. at a cost of $106, Approve in principle the installation of: -a"Playground Zone” sign on the east side of Western Dr. , -a crosswalk on the south leg of the T-intersection at the school across Westem Dr. and, -a stop sign on the northeast corner of the T-intersection at the school -a gravel or concrete walkway on the west side of Wester Dr. from the existing gravel pathway to the T-intersection at the school. when Westem Dr. is completed to Confederation Dr. in Citadel Heights. Attached is a re t for numerous changes to the area approaching Haze! Trembath School submitted by the Parents Group for Traffic and Safety of the school. Existing Rosd Conditi continued -intersection of Eastern and Westem is a two-way stop. The stop signs are located on Western Dr. allowing Eastern Dr. motorists right-of-way movements. -there is an existing sidewalk on the east side of Western Dr. from Eastern Dr. to the School, -a gravel pathway exists running through the Hydro powerline right-of-way that children from west and south of the school use to access the school, ITEM | PAGE | 74