Detailed design: (to facilitate building grades for BOSA Development, i.e. design of road fronting property) detailed ground survey, legal pin survey and proposed development plans. detailed road and drainage survey. set building grades and prepare design drawings. SCHEDULE ° Schedule is dependent on environmental approval in conjunction with NWPA approval and the required EARP process. Typically this time period is shx months. However this.time period can be reduced to four menths if all reviews go srnoothly and in parallel with NWPA approval. : | Anticipated (optimistic) schedule: _ Complete preliminary design _ _, Apr. 30, 1994 Start detailed design : es May 15, 1994 Tender contract | Sep. 15, 1994 Construction Completion jun 15,199¢5 Astessymnent Re yur Praject MK Envirou manta