‘ “ ij Fo@_ AcCOuATING Peres ONLY! ) — Ne . CONTRACT 89-0168 P/S : a SCHEDULE OF LUMP SUM PRICES eo 1. Removal of existing pumps, controls etc. $ 2,000.00 : a a 2. Temporary by pass pumping 3 4,000.00 — : 3. Replacement of pumps, controls, panels mo | a etc complete including revision to the 7 : 7 pumpstation top and lid 3 5S ; 120,00 ae 4. Fill, grading, topsoil and sod at ome ao pumpstation $s 5,000 ,00 a - 7 5. Tie in to forcemain and commissioning ; PS the station ; $ a. 0002 . OO ; - ~ : 6. Allowance for unspecified remedial work | if ee on existing wet well ( eg. grouting) $ 2,000.00 en 7. Provisional Items a) provide and install electrical duct £rom pole to kiosk complete with : ear pilaster s 2500,00 a b) variations as listed by tenderer in 7 ! tA “schedule of variations" WAS