THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM MEMO TO: Igor Zahynacz August 20, 1991 City Engineer MEMO FROM: Gordon Voncina Operations Manager SUBJECT: Cedar Park Walkway As requested, I have provided an estimate for the paving of the Cedar Park walkway as an option to the bridge improvements. Enclosed, please find two (2) detailed estimates for the: paving work and a map illustrating the proposed location of the asphaltic surface. Option 1 _ This work consists of paving 360 m2 of asphalt at a 50 mm thickness, including -Testoration of the surrounding grass areas disturbed as a result of the work. roa estimated cost for Option 1 is $6,837. This option includes all of t the work outlined in Option 1 with the addition of 50 mm of 19 mm minus base gravels and the installation of a black poly membrane to minimize _ vegetation penetration of the asphaltic surface. ( 5 / tw | che ) | _GV/al “enclosed