7 | r\ THE CORPORATION OF THE CITY OF PORT COQUITLAM C t 1 i 1 MEMORANDUM FEB 18 38) TQ: Mayor and Council February 8th, 1980 FROM: Building & Protection Committee ’ Report from the Joint Meating of the Building & Protection Committca and Public works Committee held Thursday, February 7th, 1980. IN ATTENDANCE: Alderman MLR. Wright. Alderman E.W. Mabbett Pw. Peters, P. Eng., City Engineer Alderman 1.M. Traboulay gave his views prior tO the meeting, ITEM 3 Sea e aati Res Selection of Consultant for Design and Construction of Pumping Stations Requosts for proposals werd Beol Bay to thyrec consultants and two Proposals were received, Both proposals are based on payment of aetual. cost of the time spent by the consultant according to a pravestablished fee schadule, The proposals give both the fee schedule and the estimated maximum cost. as follows: 1. Crippen Engineering - Fee Schedule - Office Engineering Salary x 2.5 ~ Field Engineering Salary x 2.3 Total Uatimated Cost ~ $50,000 2. Associated Engineering - Fee Schedule - Rates vary from $57 per hour for Prineipal Engineer to §16 pax hour for support staff, Estimated Cost - $39,400 Both of those consultants have the qualifications to do the work. Crippen were rosponsible for the construction of tha Cedar Gurive PumMphouse ag well as the foundation structures for the pronasad pumping stations, Rowever, sone of thea key engineering ataff who were raspongible for thase pravious projects ava no longer with Crippen. Associated Engineering were responbi= ble for peveral] dyking programs ineluding the Mayfair Industrial Bark storm pumping station and Punping stations in Mataqui-palta and New Woutmingter, fbvene