THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM Project No. 794 TO: Igor Zahynacz. P.Eng . City Engineer FROM: Russ Mammel DATE: October 7, 1993 SUBJECT: TRAFFIC IMPROVEMENTS ON PITT RIVER ROAD, YUKON TO ROUTLEY. The request attached is asking that the City construct a side wa: . on the east side of Pitt River Road. from Yukon Street to Routley Street. The reason for this request is to provide safer travel for children walking to school, by not requiring chem to cross Pitt River to use the sidewalk on the west side. The length of sidewalk would be approximately 200 meters. Also required would be curb and gutter and approximately 3 metres of road widening. Approximate construction costs would be: Sidewalk 12,000 Curb & Gutter 10,000 3m Asph & base 15,000 3 catchbasins 4,000 Boulevard restoration 4,000 ; $45,000