ft hittan at nnd Ml x Reld ane ds rahul arinae na ara Hh aa NE arate ia RR) DAY) AN BET Med Nn ae We tity wei i Ra ea 4 it ‘ au ru a vith ane. ices Neier (uitiier ty ening tbh ay? ' teed’ ’ ty . HY ¥ ia jar} Pee TE SAN iW ag git bay ° Cars Meg January 14th, 1985 9 PW/13/85/01/ 14/25 From the City Engineer, January 10th, {985 regarding schoo] crossings on Hastings Street, Moved by Alderman Laking: Seconded by Alderman Wright: That the Westwood Home and School Associatton be permitted to erect. and remove plywood Silhouettes of schoo] children at two points along Hastings Street during schoo| hours, namely at Kitchener Avenue and Patricia Avenue tn accordance with the attached letters ; And that the City Install crosswalks at the two above locations in order to concentrate the crossing of students at these two points; And that the City assist with the construction of the plywood Silhouettes by donating the Plywoed and reflective materia le Carried, zarried. PW/14/85/01/14/30 From the City Engineer, January 10th, 1985 regarding early approvals for 1985 Capital Budget. Moved by Alderman Laking: Seconded by Alderman Wright: That the Engineer be authorized to proceed with the following items in the 1985 Provisional Capital Budget: (a) Intersection improvements for new bus routes [in the amount of $12,000 out of Revenue. (b) Order for later delivery equipment to replace worn out vehicles in the existing fleet at a total cost of $159,000 to come out of the Equipment Reserve. Order the relocation of B.C, Hydro, Telephone, Cablevision Poles and an Underground vault In Preparation for the reconstruction of the two remaining blocks of Oxtord Street between Prairie and Westminster Avenues at a cost of $28,000 to be Split between Genera} Revenue and the Dept. of Highways under the Revenue Sharing Program. | Carried, PW/15/85/01/14/35 From the City Engineer, January 10th, 1985 regarding the municipal boundary along the Coquitlam River.