The Grantor hereby covenants and agrees that the open drainage ditch within the Statutory Right-of-Way on che said lands used for storm sewer purposes is intended to be temporary only and that at such future time as the said lands are subdivided or a building permit is applied for construction of any building or structure on the said lands, the Crantor will build or install an enclosed storm sewer system to the City's then existing standards and requirements. THE GRANTOR HEREBY COVENANTS and agrees with the Grantee that the Grantor Will not erect, place or maintain any building, structure, concrete driveway or concrete patio, on any portion of the Statutory Right-of-Way. i) 1 AND THAT the Grantor will not do or knowingly permit to be done any act or thing which will interfere with or injure the said works and in particular, will] not carry out blasting on or adjacent to the Statutory Right-of-Way, without the consent in writing of the Grantee provided that such consent shall not be unreasonably withheld. AND THAT the Grantor will not diminish nor increase the sol over any pipe installed in the Statutory Right-of-Way withou in writing of the Grantee. AND that the Grantor covenants and agrees with the Grantee that any and all chattels and fixtures installed by the Grantee on the sald Statutory Right-of-Way shall be and shall remain chattels, any rule at law to the contrary notwithstanding and shall belong solely and exclusively to the Grantee. The Grantor covenants and agrees to allow the Grantee its agents and servants, to enter upon the said lands as aforesaid to install, repalr, maintain, inspect, and service the said works, and snall not interfere in any way Nor prevent any such person coming on che said land for such purposes. ntee hereby covenants and agrees with the Grantor that the in its carrying out or any or the WOKS: will not bury debris or rubbisn of any kind in excavations or mackfill, and wll remove shoring and like temporary structures as bac ‘filling proceeds: will thoroughly clean the site, raking up all rubbish and construction debris and leave the site in a neat and clean condition; will, as soon as weather and soii conditions permit, and insofar as it is practicable so to do, bury, maintain, repalr, and/or replace and remove all underground works so as mot to interfere unduly with the drainage.of the land: will, as far aS reasonably necessary, carry out the construction, maintenanck yrehe hcpag Ynd/jor replacement, and renewal of the said Work grrr rg and workmanlike manner so as to do as Little injury as ible; and, IT? IS MUTUALLY UNDERSTOOD, 89 Ki@diiGlemnitetbGlnahenc Jared by and between the parties hereto that the covenants herein contained shall be covenants running with the land and that none of the covenants