“The above comments apply to the major recommendation cf constructing the bridge. There are some additional which need to be clarifi it would be nice to be able to say that we Sting Kingsway Bridge to the Red Bridge Page 21 of the AJE.S.L. report clearly -identifies the need for further Study of this relocation option. One of the elements which needs to be identified is the type of foundation which would be required and this requires a geotechnical investigation, In checking with A.E.S.L., they suggest an allowance of about $4,000 for a geotechnical investigation and $3,000 for the study and report Similar to the report on the Kingsway Bridge. The Committee recommends that We proceed . immediately With this further study at an approximate cost of ' $7,000, eat RN RIL Ont, SRE nto The obvious question which was not addressed by the Public Works Committee is the method of Paying for the works Proposed. It obviously is fo our advantage to attempt to get possibte Provincial grant. Since the Kingsway Is part of the approved arterial network for the City, it was felt that there wouid be less difficulty in getting a grant for the Kingsway construction than for the Pitt River Road Bridge which ji not on the approved network, That is the reason for applying for a grant for the fulf amount of the Kingsway Bridge and using the insuranee Proceejs for the relocation to the Red Bridge site. '# a full grant ‘is not availabie then other methods of financing must be found and these will be the subject of. a report from the Finance Committee. ANAS set ana AAEM USE go KA all A F.E.'Petérs., P. Eng. ——— City Engineer Tr ETH ea narneeaaarareatn sen neat stthenn pe cateenk Sa ee armen etn nana ay, 43 pet thant Me ON hades, : ‘ + meee TT eee ae enge: ig SU Stee een man arnsattn bhatt ahi iag aise tunnel ontario WO heestatgte SESS RES a