The watermain installation along Cambridge Street and Dorset Avenue wiill impact the roads which are in sub-standard conditions. The GVRD has offered to cost share any asphalt repairs required on the roads. These roads would be good candidates for the 1994 Road Mill and Overlay program. | At this time the routing along the Lougheed Highway is still being negotiated with the Ministry of Highways. The tentative date of construc ption for this project is the spring of 1994. a Andrew de Boer Project Engineer