aly ISNA QECLAN J. ROONEY, PEN. HUNTER LAIRD ENGINEERING LTD, wcormevounnaser 4300-65 RICHMOND STREET, NEW WESTMINSTER, B.C, V3L 5P5 TEL: (604) 525-4651 FAX: (604) 525-5715 denen aie cece ERPIE FR? mores = pry Bs CERES ME ou ENGUEER Ete 689. City of Port Coquitlam i r- ofiy lo MAR 44 2580 Shaughnessy Streeti.! Las, Port Coquitlam, B.C. V3C 2A8 Tm 908 oem we mem Cem Pw Ute ore em ee nts Attention: Mr. Igor Zahynacz, P. Enq. Dear Sir: Re: Proposed Industrial Deve Kingsway/Maryhill Bypasg for The Beedie Group As discussed at our meeting last week, we are writing to request confirmation that the city will reimburse the developer for the cost of the pressure reducing valve station to be installed as part of the water supply system with this project. our estimate for the pressure reducing valve installation is as follows: Supply and installation $50,000.00 20% Contingency 20,000.00 Total Construction $60,000.00 Engineering Fees 1. Geotechnical Investigation (letter attached $ 740.00 ) 2. Engineering Design, Contract Management (10%) 6,000.00 3. City administration and Inspection Charge (4%) 2,400.00 Total $69,140.00 We suggest that this amount be allocated for budget purposes but understand that all reimbursement will be based on actual costs supported by documentation. Please contact the undersigned if you have any questions with respect to this submission. yours very truly, HUNTER LAIRD ENGINEERING LTD. P. Engé. DIR/th cc. Beedie Group Attn: Mr. Colin Beedie CIVIL ENGINEERS ° PCLANWER