RYH i 4 hse (c) remove shoring and like temporary structures as backfilling proceeds; rake up all rubbish and construction debris. in order to leave the Statutory Right of Way in a reasonably neat and clean condition; exercise. the utmost care not to damage: the Lands Or any improvements.on the Lands. and if Canfor should. cause any such damage then Canfor shall repair such damage and restore the Lands with improvements thereon to the satisfaction of the. City Engineer and if Canfor fails to repair such damage: and restore the Lands: and improvements then the City may perform such. repair and restoration. to the Lands and improvements that is deemed necessary by the City Engineer and Ca nfor shall fully reimburse the City for such reapa@irc and: restoration within two weeks. of receiving an account. from the City;. accept sole responsibility for carrying out the Works >; t not be unreasonable in its Opinions. herein; not obstruct or interfere with the City's right of passage on the travelled portion of the Lands, and in particular Canfor shall not allow the operation of the Works to result in the deposit of any material on the Lands; keep the Statutory Right of Way and the Lands Surrounding the Statutory Right of Way clear. of