Mr. Richard A. Tuttle Inlet Realty Ltd. Page 3 _ 2,2 Traffic Impact Figure 3 shows a recent traffic coy By-Pass/Pitt River Road, occurred from 16:00 hrs. 2578 vehicles per hour, nt we conducted at the inter On a weekday p.m. peak hour. to 17:00 brs., with Aa total a section of The p.m. peak hour Pproach volume of - @ percent (0.82%) of the current intersection volume, a very negligible impact in the overall context. 3 Using the Highwa G today at a level of serv i retion conditions. In probably varies fact, the peak hour volume if more than 20 vehicles per hour. 3.0 ROAD GEOMETRICS AS noted in Section 1.0 above, the intersection of Ma Pitt River Read is built to full highway Standards, o the Argue/Pitt River intersecti Y standards for "byipe designs of However, due to the adequate for the the existing layout appears oms. The turn slots from the By- hbound can oe In the long tern, os the By-Pass, there would b