ye aie na kt " } fhe TAM ¢, pear WA yrange ¢ wad bg Long Term A long term solution would be to pave the west shoulder in the damaged area with asphalt This would create a left-turn lane for southbound vehicles entering Birchland. The new section would be approx. 2.5m wide and would "fill in" gravel areas between existing driveways. (See sketch) Cost of asphalt handwork: 75mm lift - 21 x 2.5 x .199 $200fonne= $2,089.50 contingencise( 15%) $313.00 TOTAL $2,402.93 say $2,450.00 theo ee Anne T. Pynenburg Project Techician attachments aip