Page 4 of 6 AND HAVE AND TO HOLD unto the Grantee, its successors and assigns forever. THE GRANTOR HEREBY AGREES that for the purpose of installing the works initially, the Grantee may enter upon an additional five metres of the Grantor's property adjacent to the Statutory Right-of-Way. THE GRANTOR HEREBY COVENANTS and agrees with the Grantee that the Grantor will not erect, place or maintain any building, Structure, concrete driveway or concrete patio, on any portion of the Statutory Right-of-Way. AND THAT the Grantor will not do or knowingly permit to be done any act or thing which will interfere with or injure the said works and in particular, will not carry out excavation on or adjacent to the Statutory Right-of-Way, without the consent in. writing of the Grantee provided that such consent shall not be unreasonably withheld. | . AND THAT the Grantor will not diminish nor increase the soil cover. over. any dyke installed in the Statutory Right-of~Way without leave in writing of the Grantee. oo . AND that the Grantor covenants and agrees with the Grantee that any and all chattels and fixtures installed by the Grantee on the: said Statutory Right-of-Way shall be and shall remain chattels, | any rule at law to the contrary notwithstanding and shall -belong © sOlely and exclusively to the Grantee. | Re “The. Grantor covenants and agrees to allow the Grantee its agents. and servants, to enter upon the said lands as aforesaid to. cinstall, repair, maintain, inspect, and service the said works, — and shall not interfere in any way nor prevent any such person: coming on the said land fo. such purposes. | The Grantee hereby covenants and agrees with the Grantor that the — Grantee: |. a | | Se oo (a) will not bury debris or rubbish of any Kind in| excavations or backfill, and will remove shoring. - and like temporary structures as backfilling. proceeds; me | ; eS will thoroughly clean the site, raking. up all” rubbish and construction debris and leave the site. ~ in a neat antredean—condition; oe oe