THE CORPORATION OF THE CLTY OF PORT COQUITLAM LAND USE CONTRACT Section 1 -Works to be constructed by Camrose Development Ltd. as provided in Section 12: Type . Approximate Amount of Deposit Required Cost Breakdown by Way of Letter of Credit 9 Watermains 20,800.00) Storm Sewer Mains 8,600.00) ) Road Construction 18,360.00) Street Lighting 22,000.00) $94,595.00 ) Curbs and Boulevard 10,835.00) ) Underground Electrical ) Installations 14,000.00) Section Z@ - Amounts to be paid to the Municipality as provided in Section 12: Type ; Payment Required $ Engineering Fees 3,784.00 Water Capital Fund Contribution 18,000.00 Storm Sewer, Road Work, Curb and Boulevard on Angelo Avenue and Robertson Avenue | 100,000.60 Sanitary Sewer Installation on Robertson Avenue 12,200.00 Addl wards Tie-ins and Connections 10,000.00 Total . $143,984.00 Section 3 - Amount to be paid to the Municipality for transnittal to Grampion Ventures Ltd. in consideration of work done by that Company for the benefit of the development authorized pursuant to this Land Use Contract: $42.125.00 The Dollar amounts stated in Section 1 of this Schedule are based on the City's Preliminary Engineering Design and Preliminary Cost Estimates. As a result of Final Engineering Design to be carried out by the Developer, quantities, locations, sizes, etc. might vary from those determined from the preliminary work and the City does not in any way ensure that actual increased costs resulting from the Final Approved Engineering Design and Tender Call will not occur. Any increased costs over and above the stated bonding amount of $94,595.00 shall be the responsibility of the Developer. | Nore: Amended. age for A en of Tem *S- P? 7 > Ut 3 197 By-law "7437, Under lived words added. Ciry Cueey