THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMO TO: D. Riecken June 6, 1990. Acting City Engineer MEMO FROM: S. Brown Assistant Cperations Manager SUBJECT: Abandonment of the Chelsea Sanitary Lift Station I have reviewed the plans attached with this memo for the abandonment of the Chelsea Lift Station in the Chelsea/Pimlico Place area. The estimated cost of the project is $11,500. The estimate includes the following works: 1) extension of the 200 ยข gravity sewer main from manholes $.5.A to . existing manhole, approximately 14 meters. 2) 2 disconnection and removal of the existing pumps and controls in the station, along with the back filling with sand. 3) . The asphalt cutting and patching as required. Call me if you would like to discuss this in further detail. Se Brown VE