May 29th, 1978. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the Public Works Committee, May 26th, STOP signs be installed on: Lombardy Drive:eastbound at Cedar Drive; Commonwealth Street northbound at Westminster Avenue; and Laurier Avenue westbound at Shaughr.ossy Street. Carried. From the Public Works Committee, May 26th, 1978 recommending PWC, May 26/78 re Local Impr. -Hamilton, Langan & Grant three local improvement projects be undertaken this year. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the Public Works Committee, May 26th, 1978 three local improvement projects in the following order of priority be undertaken this year. 1. 3600 block Hamilton Street - storm sewer, curbs and pavement required ~ cost estimate - $64,000.00 - Resident cost (normal) at $13.75 per front foot equals $16,620.00; 1700 block Langan (advanced program) - storm sewer, pavement and curb and gutter required. Cost estimate - $105,000.00 - Resident cost (advanced) at $36.50 per front foot equals $69,350.00; Grant Avenue from Wellington to Coast Meridian - storm sewer, curbs and pavement required. Cost estimate - $118,000.00 - Resident costs (normal) at $13.75 per front foot equals $31,900.00. AND THAT a report be prepared now on the work required on St. Anne Street, Essex Street and Newberry Street so the work could be done as a winter works program. Carried. Prior to passage of the foregoing resolution a short discussion ensued. From the Public Works Committee, May 26th, 1978 recommending that PWC, May 26/78 re Shaughnessy - Chester right turn lane the City not spend money on construction of a right turn lane from 1 Shaughnessy Street to Chester Street at this time. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That. as recommended by the Public Works Committee, May 26th, 1978 the City not spend money on construction of a right turn lane from Shaughnessy Street to Chester Street at this time. Carried.