7. 8. 96 10. li. 12. 13. Bley lei a. brie rea ae m The compesition and nature of the aoil to be removed ig: The method of removal will be The dates between which the soil will be removed are to e Vehicles used for removing the soil will only obtain access to and from the property via (name of street) as shown on the sketch plan provided pursuant to paragraph 7 of this application. ' The proposed route to be used in and through the City of Port Coquitlam by vehicles carrying the soil to be removed is The following safety measures to prevent personal injury or property damage to persons or property in or about property cr on adjacent roads will be implemented: . The soil will be removed so as to cause no erosion, stability or drainage problems on the property cr to neighbouring properties and the following measures will be taken to achieve those objects: