THE CORPORATION GF THE CITY OF PoRT COQUITLAM wom UOUNCIL APR 28 1989 . Mayor and Council April 24th, 1989 Public Works Committee IN ATTENDANCE: Mayor G.R. La All Aldermen P.E. Peters, P. E L. Melnechenko, P king ng., City Engineer - Eng., Assistant City Engineer. o Re: Techram Servicing Requirements &@ storm water det flows off the Property to the level that would have occurred if the Property had not been develo Orage places will be by means of recognized Flow control devices. ‘the controlled runof. would Sewer to the south side of the Lougheed Highway and then by storm fewer to Lancaster Street where it would discharge into the existing creek running south on Lancaster and through the City park * Eventually this creak @ south side of Davies £ from the development will be kept to ut the development. The a eas of the parking lot to a maximum depth x i torm occurred. More Oraga times. An advan~ might provide a more he creck through the park, recommends that the alternative drainage System as proposed by the wah Cveloper's engineer and described above be acceptad Provided that the developer also upgrades the culvert on Maple Cre ros ‘i ¢ GSway Avenue so that it no runoff from Maple Creck, [Benes