THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk DATE: July 31, 1991 City Administrator LR. Zahynacz, P. Eng. City Engineer Draimage Problem - 3865 Hamultonm (Public Works Committee Meeting of July 30, 1991) That the City install a lawn catch basin complete with 150mm diameter lead in front of 3865 Hamilton at an estimated cost of $1,000. | , That $1,000 be allocated from the Public Works Special Reserve Fund for this purpose. The Public Works Committee considered a memorandum from Ike De Boer, Project Technician, regarding a request to correct a drainage problem in front of 3565 Hamilton. - | ee The Committee noted that the "Sun Valley" subdivision is low in elevation and is subject to ponding in some locations. As theze is an existing storm sewer under the boulevard in front of 3857 Hamilton, it is recommended that a lawn basin be installed at this location and connected - directly into the storm sewer. IRZ:gc Attachment "There is sufficient funds in the Public Works Special Reserve Fund for this purpose. —