et By 1! OPEN a e tt at ; als eri a : R : . D ws: SULRAREER IN Rae A OTe Ae i : parte : i itr edt MEMORANDUM Cee GRETA ROE ANNE CURE HORE HERO ETEIT TO: Igor Zahynacz DATE: August 3, 1990 City Engineer FROM: Ike De Boer Project/Traffic Technician SUBJECT: MARY HILL ROAD OPPOSITE STAFFORD Background: An owner of one of the homes on Stafford backing onto Mary Hill Road has expressed concern that a vehicle could run off of Mary Hill Road and into their backyard. See Figure l. CURRENT CONDITIONS: Mary Hill Road in the area of concern is fairly ee ee ee straight. There is a slight curve 80 m South of Lot 268. The rear yard elevations are approximately 4~6 metres lower than the Mary Hill Road centerline. RECOMMENDATIONS: Install approximately 20 m of “No Post" guard rail in — the location as shown on Figure 2. This location was chosen due to the possibility of a vehicle not negotiating the curve as shown on Figure 1. For the remaining road shoulder behind Lots 267, 268 and 269 a reflectorized post at the spacing and locations shown on Figure 2 should be placed. "No Post" guard rail @ $55.00/m x 20m = 1, Installation of Posts @ $100/hr x 1.5 hr 3 4x4 or plastic posts c/w reflector installed @ $35 ea. x 5 * TOTAL $1,425.00 Ikef De Boer Project/Traffic Technician Attachment ID:ck Sa , 700.00