THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TO: Igor Zahynacz, P. Eng., DATE: January 17, 1991 ity Engineer FROM: Kip Gaudry, P. Eng. Deputy City Engineer SUBJECT: EST # 186 — WESTWOOD, DAVIES, FOX We are considering the tentative approval for the above noted application. The following items should be considered at the next Public Works Committee Meeting: ROADWORKS = ~ Total Development Cost Charges Payable $72,000.00 (Westwood & Davies only) A) WESTWOOD Existing - Road works on Westwood are planned for 1991 using Provincial Grant and Public Works Capital plus DCC contribution. - 20m Right of Way - Arterial ~ Existing width 4.25 metre to centerline Required ~ 7 metres to centerline plus curb & gutter oe ~ traffic light at Davies/Westwood. eo ~ Sidewalk on Port Coquitlam side. Developer - 2.75 metre strip only added to existing 4.25 for total of Proposes 7 metres. RECOMMENDATION: . ~ Developer construct road to centerline of Westwood i.e. 7 a Ds meter roadway. . ~ Install all conduit for traffic lights at Davies /Westwood . - See Bylaw - Clause 403