Municipalities with sliding scales: Coquitlam...... Population 69,295 6 permanent and 1 part-time inspector engineering fee based on sliding scale under $200,000............4% $200,000 - $500,000........3.5% over $500,000.............3% no developer’s inspectors; city inspectors check everything Surrey.......Population 181,445 1 chief inspector, 3 assistants, 5 inspectors engineering fee based on sliding scale under $200,000...........4% $200,001 - 450,000........3% over $450,000.............2% —. bring in developer’s inspectors for land development city inspectors check everything from the bottom of the trench topsoil | if testing of materials required, it is done by developer’s inspectors and a report is sent to city | | Contact person: Rick Bull, Land Development Engineer ‘Municipalities using percentage basis: _ North Vancouver(city)......Popula’ 'on 35,970 - 1 inspector | | | - engineering fee based on 5% administration fee - contractor retains engineer to inspect site and city inspector work. | 7 | West Vancouver......Population 36,265 ~5 inspectors : | | | | eS - damage deposit of $2,205 , other fees collected from developer for servicing of lots ie. Sanitary, water, storm : oe . 7 -no developer’s inspectors | | | New Westminster.......Population 39,970 | - 3 Engineering Technicians conduct inspections - 4% of estimated cost of project, called administration fee = ; - contractor retains engineer to inspect site and Eng. Tech. oversees all work done. | a oo _ - Eng. Tech. inspect all city capitol works projects