page 2 - cont’d COST ESTIMATE FOR DAVIES/HASTINGS ROAD IMPROVEMENTS ADDITIONAL RIGHT TURN LANE AT LOUGHEED ON WESTWOOD (NORTHBOUND) PROPERTY REQUIREMENTS: 2.5m 46.5m= 116.25 m2 2.5%30;32= 37.5 m2 154m2 = 1658 f2 x $20/ft2= 33,160.00 RE & RE CURB AND GUTTER AND SIDEWALK: “mx 1.5 m sidewalk x 21.5/m2 75mC & G@ $30/kn C & G removal @ 11.80/m sidewalk removal & disposal @ 10.60/m2 ROADWORKS: excavation - 2x 75m @ 60 m (exc, base & asphalt) RELOCATE: 1 streetlight pole is 1,000.00 i CB 750.00 1 fire hydrant ‘ 1,500.00 Total Reconstruction 14,610.00 Eng & Cont & 25% 3,653.00 18,263.00 Total including Land Acquisition 51,423.00