ee tite am eRe ae sos ‘ ; ie Mw, tn hed a ‘ ? A Tig ail? "the, shel sad ato gas Gea re “ : Beare AME ASI AMMO ocit en et Baie 4Y st CITY OF PORT COQUITLAM ENGINEERING DEPT. DEC 03 (9M FILE + ee eae wt teh Ory 8 00 Fh HO ON EA 0 ND OT THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM DATE Igor Zahynaer; PENG Cit gineer Andrew de Boer Project Engineer December 2, 1991 L. That Coast Meridian Road be reconstructed from Lane south of Prairie to Patricia at a cost of $1,000,000. 2. That an application be made to the Ministry of Highways for a 50% grant for the reconstruction of this road section. BACKGROUND Coast Mertdian from the Lane south of Prairie to Lincoln requires reconstruction due to surface and subsurface failures along the section indicated. The total cost for this work is estimated to be $1,000,000 which includes: 1.-Road reconstruction complete with curb and gutter, and sidewalk on the west side of Coast. Meridian; Replacement of ditches with storm sewer; CMA OTE aes on Tah se Wy Gane } The redesign of the Prairie/Coast Meridian intersection} ' Road wideniag to 14 m north of Salisbury to Lincoln; Asphalt picydae paths; cant 5. Street Lighhs). Attached is a cost summary for the required works. (ME Andrew de Boer Project Engineer