November 20, 1989/243 From the City Engineer, November 14th, 1989 regarding Relocation of Bus Stop on Kingsway East of Gately Avenue. Moved by Alderman Laking: Seconded by Alderman Wright: 1. That the request to relocate the existing bus stop on the north side of Kingsway west of 2541 Kingsway to a location east of Pinetree Lighting as indicated on the attached sketch be approved. That the Traffic Bylaw be revised to reflect the proposed change as indicated in Recommendation 1 if approved. Carried. From the City Engineer, November 14th, 1989 regarding Parking Restrictions on Pitt River Road North of Cameron Avenue. Moved by Alderman Laking: Seconded by Alderman Stewart: 1. That "No Parking at Anytime" restrictions be imposed on the west side of Pitt River Road from Cameron Avenue to a point 30 metres north. That the City Clerk be instructed to amend the Traffic Bylaw to reflect the changes stated in Recommendation 1 if approved. Carried. From the City Engineer, November i7th, 1989 regarding Application for Water and Sewer Capital Works Grant. Moved by Alderman Laking: Seconded by Alderman Stewart: That the 1990 Water and Sewer Capital Grant Application include the following projects: A. Sewerage Works 1. Install new mains in downtown area between $240,000 Kelly Avenue and Pitt River Road. 2. Instail new main on Coast Meridian Road $ 71,000 between Coquitlam and Westminster Avenues, 3. Install new main along Bypass between $200,000 Coast Meridian Road and Broadway Street. Water Works 1. Install new main on Eastern Drive from $443,000 Lamprey Drive to Western Drive. Install new main on Vincent Street between $ 50,000 Prairie and Coquitlam Avenues. Carried.