THE CORPGRATION OF THE CITY OF PORT COQUITLAM LAND USE CONTRACT SCHEDULE "Dp"! Section 1 - Works to be constructed by Walter Gordon Mitt and Clara Laverne Mitt as provided in Secrion 12. . Approximate Amount of. Deposit Required Type Cost Breakdown by Way of Letcer of Credit § Waterzains 8,125.00 ) ) torn Sever Mains 10,150.00 ) . ) Road Construction 2,000.00 ) ) Zoulevards 790.00) _ wee ee ; $27,737.00 Underground Electrical 1,500.00 ) . ) Sidewalks : 1,580.00 ) ) Lane 2,092.00 ) ) Pole Relocation 1,500.00 } Section 2 - Anounts to be paid to the Municipality as provided in Section 12. Type Payment Required $ Watermain Tie-in . 1,400.00 Water Maintenance Fee 25.00 Stora Sawer Tie~in 1,950.00 Parcel Creation Fee (1) @ $10.06 10.00 Plans Approval Fee 2.00 42 Engineer’s estinate for inspections . 1,109.00 24 Parcels 2 $300.00 each for Future Water Capital Expenditure Fund 7,200.00 - Total 11, 696.00 Water and sewer connections will be estimated at time of building permit application. The Dollar arounts stated in Section 1 of this Schedule are based on the City's Prelininary Engineeriag Design and Preliminary Cost Estimates, As a Fesult of Final Zaginuering Design ta be carried out by the Developer, quantities, Jocstions, sizes, ete; might vary from that determined from the preliminary work and the City does not in any way ensure that actual increased costa rosulting fram the Final Approved Engineering Resign and Tender Cali wil} nat accur, Any increased casts over and abave the stated banding amaunt ef $27,737.00 shall be the responsibtlity of the Developer,