peat | # ii 4 wf,’ THE CORPORATION OF THE CITY OF PORT COQUITLAM °SOTL REMOVAL REGULATION BYLAW NO. 2666" ASSURANCE OF GEOTECHNICAL DESIGN FOR SOIL REMOVAL AND COMMITMENT FOR FIELD REVIEW City Engineer City of Port Coquitlam 2580 Shaughnessy Street Port: Coquitlam, BC. V3C 2A8 Dear Sir: Re: Application for Soil Removal Fermit at civic address I, the undersigned registered professional eugineer/landscape architect hereby give assurance that the design, location, quality, nature, depth, volume and configuration of the soil to be removed and works to be constructed and undertaken in support of and in relation thereto all as shown on che plans aud gupportting documents prepared and signed by me and attached to thia letter are consistent with sound reasonable soil removal engineering practice, and when and if carried out in conformance with such plans and apecifications will not constitute any reasonably foreseeable risk or hagard to persons or property. I undertake to conduct such supervision, testing and field review to ensure that the removal of soll substantially complies with the plans, specification and supporting documents attached hereto. I assure you that I have been given the authority by the owner of the landa from waieh the soil ia to be removed and by the applicant for the perade (if different from the owner) to step, remove or redirect the removal of soil as required in my judgment and as required to comply with the plans, specifications and aupporting documents attached hereto. I will notify you in writing immediately 4f my contract for field review, testing, or supervision is terminated or limited at any time before the completion of the removal of soil and works described in the plans, specifications and gupporting documents attached hereto. (affix professional seal) Signature