After the removal of the soil from the property the following measures will be taken to stabilize, reclaim, landscape and restore the property: (if insufficient space please attach a clearly marked schedule) The following measures will be taken to prevent soil spillage and tracking onto the City’s streets and roads, and to clean the same: The following measures will be taken to protect and to keep clear and clean of all sediment, silt, leaching or other fouling or obstruction of wells, natural watercourses, septic fields, water works, sewers and other utilities, drains, ditches, culverts, catch basins and other public works: (if insufficient space please attach a clearly marked schedule) If the volume of soil to be removed exceeds 200 cubic metres there is attached a survey plan prepared by a British Columbia Land Surveyor of the property from which the soil is to be removed showing a one metre contour interval or a grid of spot elevations no more than 5 metres apart on the parcel and indicating all the information required by Section 9 of Soil Removal Regulation Bylaw, 1993, No. 2827. Where the amount of the soil to be removed exceeds 200 cubic metres and Section 10 of Soil Removal Regulation Bylaw, 1993, No. 2827 applies, the required plans, specifications and letter of assurances and undertaking all duly signed and sealed are attached to this application.