Gcetoher 31, 1989 Zoning amendment for this project is adopted by the City Council. March 15, 1996 Dr. Amin has a second proposal with some modification to his desi. ais proposal is prepared by a fire protection engineering firm and ub cted under the equivalency section of the B.C. Building Code. ADDED PROTECTION PROPOSAL: 1, Install “quick response" Sprinkler heads. @. Provide a "fully supervised" fire alarm system. Increase floor, wall, and roof assemblies from a 3/4 hour fire rating to a one hour fire rating. Fire protection engineering firm to provide the City with a letter of professional assurance. 1. I have reviewed this equivalency with the: City Fire Department B.C. Building Standards Branch City Public Safety Committee The mezzanine does not affect the building height for exterior appearance. The policy vf the Building Department is to refer any equivalency to the Public Safety Committee for review. OPTIONS: 1. Accept the equivalency. 2. Dr. Amin must redesign the top floor of his building and make new financial arrangements. CONCLUSION: Due to the degree of fire protection and given the current B.C. Building Code section can be used, option #1 is recommended. dhe JDS/vrm£ *COUNCIL®