Pa An application for a plumbing permit for fireline or sprinkler installation shall be in the form attached as Schedule B to this Bylaw. When required by a Building Inspector, an application for a plumbing permit shall be accompanied by a plan that shows the location and size of every building drain and of every trap or inspection piece on a huilding drain, and a sactional drawing showing the size and location of every soil-or-waste pipe, trap and vent pipe. An application for a demolition permit shall pay the costs of capping off City water and sewer services prior to tha issuance of the demolition permit. An application for a sign permit shall be in the form attached to the Sign Bylaw. An application for a building moving permit shall be in the form attached as Schedule C to this Bylaw. All plans submitted with permit applications shall bear the name and address of the designer. An application for a Suilding, Building Moving, Plumbing or Sign permit will be cancelled if permit fees are not paid within six months from the date of notification to the applicant that the City is prepared for permit issuance. PERMITS Where 3 7.4.1. & completed application has been made; 7.4.2. the proposed work set out in the application conforms with this Bylaw and all other applicabie Bylaws and statutes; 7.1.9. the applicant has paid the fee prescribed and set out in Schedule K to this Bylaw; Telad. the applicant has paid ail charges and met all requirements imposed by any other statute or Bylaw; a Building Inspector shall issue the permit for which the application is made, in the form of Schedule D or Schedule E or Schedule F or Schedule G or Schedule H or Schedule f attached to this Bylaw.