OPTIONS (continued) OPTION THREE: (continued) 8. Investigate and adjust the supply and drainage system of the poal. ; cosTS/ $325,000.00 OPTION FOUR: Do those renovations as outlined in Option Three. plus additional work intended to broaden the community appeal of the facility. The intent would be to increase the level of community service and improve revenue. ~ The following items would be involved in this option: 1. Ze Option Three itemis. Expand Pool Apron 150 m2 to provide more sunuzing, leisure activity and toddler areas. Create wind screens for the Pocl Apron. Provide a small slide for the pool. Provide an artificial lighting system for the pool to extend the hours of operation. Provide a system of signage on adjacent streets on site and in the facility. The system would enable users to become oriented, provide information and raise awareness in the community about the facility. Provide a separate whirlpool facility in an adjacent deck area. The capacity of the whirlpool should be approximately fifteen persons. This component would appeal to adult users. Provision of recreational features such as: a) glide facility with separate slide pool and twin slides; b) toddler’s pool (100 m2) and play area; shallow end finished with.a soft cushion material; and c) sauma or steamroom attached to the Change Room Building. aziat TaNaP RSS a sia *