March 24th, 1980. /7. AND THAT His Worship the Mayor and the City Clerk be authorized to sign the said Agreement on behalf of the City and affix the Cerporate Seal thereto. From the Public Works Committee, March 19th, 1980 advising study had been done on the present flashing operation of the traffic signal ar Shaughnessy Street and McAllister Avenue and recommending that no change be made at this time. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended ey the Public Works Committee, Mach 19th. 1980 no change be made to the present flashing operation of th: traffic signal at Shaughnessy Street and McAllister Avenue at this time. Carried. From the City Engineer, March 20th, 1980 regarding 1980 Equipment Purchases. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recomacnded by the City Enginver, March 20th, 1980 the City purchase two pickup trucks with a short box, Model TC10703 from Pacific GMC at a cost of $11,616.86. Carried. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the City Engineer, March 20th, 1980 the City purchase one pickup truck with a long box, Model 1TC10903 from Pacific GMC at a cost of $5,892.94, Carried. Moved by Alderman Mabbett: Seconded by Alderman Traboulay: That as recommended by the City Engineer, March 20th, 1980 the City purchase two cab and chassis for flat deck, Ford from Metro Motors, at a cost of $14,463.49 plus an allowance of $2,000.00 for constructing and adding the flat decks to the chassts. Carried. PWC, Mar. 19/ 80 re Traff. Light - McAllister & Shaughnessy St City Eng., Mar. 20/80 re 1980 Equip. Purchases.