ve} thee Sfhigans Teenie i toa ! Ane, ‘ ay fe 3 rate ite ¢ ‘ aa Bat iM be teth (hd 10.2.2. after removal of formwork from a concrete foundation and installation of perimeter drain pipe and dampproofing but prior to backfilling against the foundation; 10.2.3. after qranular base materials, aampproofing membrane and if applicable, reinforcing steel has been placed for the installation of a concrete floor slab but prior to placing of concrete: 10.2.4. before a building drain, sanitary or storm sewer is covered, and if any part of a plumbing system is covered before it is inspected and approved it shall be uncovered if a Budlding Inspector so directs, and when considered necesgsary, underground building drains, branches, storm drains, and sewers shall be ratested after the completion of all backfilling and grading by heavy equipment: 10.2.5. when framing and sheathing of the building are complete, including fire-stopping, bracing, chimney duct work, plumbing, gas venting, wiring, but before any insulation, or other interior or exterior finish ig applied which would conceal such work; 10.2.6. after the placing of insulation and vapour barrier but before any interior finish is applied; 10.2.7. after the building or portion thereof is complete and ready for occupancy, but before any occupancy of the building. Prior to the occupancy of any building or part thereof after construction or alteration, or any change in clase of occupancy, the owner or occupier shall obtain an occupancy inspection from a Building Inspector, which shall not be complete until the building or part thereof complies with the requirements of this Bylaw and all othac requirements relating to the construction and occupancy of the building. In all cases where it is proposed to conduct the waste from plumbing fixtures, trade waate or surface or roof water to a public sewer the Owner shall ensure that such public sewer is at a sufficient depth and of a capacity to receive such discharge; and shall arrange the plumbing te suit the location of the connection provided for the lot. Where it is desired to connect a building or storm sewer with any building or storm sewer extension, the Owner furnish such information as the City Engineer may require to show that the proposed sewers will be laid at such depth, and in such a position as to connect the property with the building or storm sewer extension.