Page 2 Paving the training area and in front of the fire hall. At this point I was ad calculations for grades, -blacktop paving so that b getting for our money. when sitting on the driveway, it was also necessary to reconstruct out to the road edge. Some changes to the drainage system were also required, The Treasurer has. advised that there is sufficient funds in the Future Capital Reserve to do the work, , ; OPTION I in front of the fire hall be paved for $22,200 b and gutter, catch basin and necessary repairs 987 by the Public Works Department. OPTION II t of the fire hall be paved, the curb and gutter, catch epairs to McAllister Avenue be completed by the lowest That the area in fron basin and necessary r tender for $18,900 and that the paving of the trai 1987. ning area be completed in J. Boileau