ey Oe f if vi 7 pig U5 pit et CATIA ot das Bite yaaa as EQUIVALENTS The provisions of this Bylaw are not intended to limit the appropriate use of materials, equipment or methods of construction not specifically authorized herein. An owner desirous of providing an equivalent material, equipment or method of construction not specifically authorized by this Bylaw shall submit to the Building Inspector sufficient evidence to satisfy the Building Inspector that the proposed equivalent will provide the level of performance required by this Bylaw. CRIMATIC DATA Climatic data for the design of buildings in the City of Port Coquitlam shall he: Design Temperature: January 2.5% Temperature January 1% Temperature July 2.5% Drybulb Temperature July 2.5% Wetbulb Temperature Precipitation: One Day Rainfall 132 mr 15 Minute Rainfall 10 mm Ground Snow Load, Snow Component 2.5 kPa Ground Snow Load, Rain Component 0.2 kPa Hourly Wind Pressures: Probability 1/10 Probability 1/30 Probability 17/100 Acceleration-Related Seismic Zone Velocity-Related Seismic Zone ITEM