%, ite Mah sate Move emergency telephone line presently inatalled in Kilmer to Hazel Trembath School. (Hyde Creek to retain existing emergency line). COST: approximately $90.00. Inciude, in the proposed new City Hall telephone syatem, pre: sion for a third emergency line into the Hall in any declared disaster. The present limit permitted under load limit ter ig two lines only. This should be taken into consideration wi-. any new telephone system being installed. COST: approximately $90.00 for a single line installation, kewever this may have greater cost implications in the total system. . Install spotlighted windaock on roof of City Hall in conjunction with antenna installation te assist Fire Dept. and other emergency services personnel determine wind direction in the event of torte fumes released as a result of a dangerous goods accident. $900. including installation with spotlighting, appreximately 900.00. Initially this plan would require that the coordinator's truck radio be used at either Hyde Creek or Hazel Trembath School, but eventually permanently inatalled radios should be the City's objective. COST: approximately $1,500.00 each. D. Wicklund Emergency Services Coordinator [*COUNCIL*