THE CORPORATION OF THE OO me @: iy AUG 98 CITY OF PORT COQUITLAM B.R. Kirk, August 24, 1989 City Administrator T.M. Chong, P, End. , City Engineer Drainage from Hazel Trembath Site ~- Genstar's Request for Release (Public Works Committee Meeting August 22, 1989) Recommendation: Background and Comments : At the time that Genstar was developing the north ends of Kensington Place and Knights Court approximately two years ago, they discovered several drainage outfalls draining onto their Property. These outfalls were draining the Haze] Trembath School Site. tn order to prevent damage .o their Property caused by run-off from these outfalls, Genstar constructed a diversion ditch along the school's south property j outfalls, intercepted by this divers i run-off eventually ran over Drive. Subsequent to the discovered that whenever hea out which in tum resulted rocks and other Citadel Drive towards the Pitt River Road intersection, When this problem occurred initially, the cost of clean-up carried out by City crews was Captured, In view of the "cause and subsequent effect" resulting from the actions i l to proceed with - When Genstar was apprised the basis that the Problem was Several meetings took place staff. meetings. for the School Sit School Board and the this matter,