* ca ‘ . M, i THE CORPORATION OF THE CITY GF PORT COQUITLAFA C ¢ i C MEMORANDUM NOV 19 1979 Mayor and Council November 13th, 1979 F.E. Peters, P. Eng., City Engineer Re: 1979 Budget Savings As the year draws to a close it is now possible to estimate the actual expenditures for 1979 and to show the savings to the City as a result of cost-cutting measures put into affect in the last two years. The table below compares the estimated expenditures in various accounts with the 1977 actual expenditures. Despite the inflation occurring over the last two years, Council will note that some of the costs are ‘actually lower than the 1977 costs. Account 1977 Actual Estimated 1979 Expenditure Expenditure Roads & Streets $751,000 $678,000 Garbage 296,000 311,900 Pools 287,000 | 274,000 Port Recreation Centre 354,000 329,000 Parks 278,000 300,000 Although the garbage and parks totals are higher than the 1977 figures, both of these require further consideration because of the additional work which has been taken on since 1977. With the garbage one must consider a population growth of about 6 per cent as well as labour increases of ahout 11 per cent. One must also consider that this year we greatly improved the service to residents by picking up whatever was put out at the curb and saving many trips to the dump. I estimate that the actual cost would have been about $355,000 if the new method of garbage collection had not been implemented. With the parks figure again one must consider that a number of new parks have been added to the City's responsibility and that the estimated expenditure also includes $10,000 for replanting trees from the nursery. Although the above savings are partly the result of some reductions in service which Council agreed to, they are also due largely to the efforts of the Superintendents who have taken Council's wishes regarding a reduced budget very seriously and have applied themselves to making the system work in a more efficient manner. [eeees