BA . ACH mee int cpt va eae fj ‘pes MAYO? g COV mH Clo | January 5, 1994 City of Port Coquitlam HE 2580 Shaughnessy Street a rt Coquitlam, 8. C. V3C 2A8 Attention: Igor Zahynacz Dear Sir: Further to our meeting today, I request that the City undertake to connect the catch basin between 2116 and 2120 Salisbury Avenue to the recently constructed storm sewer on Street. This catch basin is a “soak away" and has never the water when heavy rainfall occurs. Several problems that accur are: down the driveway into silting & sand clogging of tile this same overflow is now so excessive that the stepwell of that house and floods the . 3) The water in the "lake" extends to the center of the road, forcing pedestrians (including school children) to share a ow portion of road with cars— (very close to the . rsection). 4) Riders have £ fallen when their bikes hit the deep water. _.'§) Large waves are thrown by cars (travelling in’ both directions). . | 6) Brakes of vehicles are soaked as they appr ach the stop sign (less than 60 feet away). | oe 7) The lake is getting larger as the ground sinks in the ‘vicinity of the: catch basin. _ . - 8) Sand baggi ing the driveway prevents cars from entering the property (and mus ¢ be: “costly to. the city to continue provi iding). Should necessary, I will (together with others) be ‘“prepar red to- ‘a public works committee meeti ng as a | delegati on, to iniate some immed: ate acti Lon in this matter oe . Tf you ave any questions regarding the foregoing, please do ot hes. tate to. contact the wri Lter directly. eS