; Série 7 ee THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk City Administrator LR. Zahynacz, P. Eng. City Engineer SUBJECT: That the City of Port Coquitlam approve the reconstruction of the pedestrian bridge over the Cedar drainage ditch located west of Cedar Elementary School at an estimated cost of $12,429. | That $172,429 be allocated from the 1991 Public Works Capital Fund for this purpose. ‘The . wblic Works Committee considered the attached memorandum from the Operations Manag r regarding the reconstruction of the pedestrian bridge crossing the Cedar drainage ditch — _west of Cedar Elementary School. | _ The pedestrian bridge would be upgraded to meet the BC Building Code standards for wheel chair access. | | There is a difference in elevation of approximately six feet between the existing bridge and the _ ground level to the west of the bridge. The ramp is designed te a grade of four percent with a _ four foot barrier fence on either side of the ramp. The total cost is estimated to be $12,429, — me Japp. LR. Zahyricz,. P-Eng. City Engineer IRZ:ge Attachments — . There is sufficient funds in the Public Works Capital Fund for this purpose. and, City Treasurer