undertake to keep damage to City Works ang services to a minimum and any damage or pavement removal shall be repatred to the satisfaction of the City Engineer; comply with the provisions of the Highway Act R.S.B.C. 1979, ce 167, other applicable statutes, and applicable bylaws and regulations of the City ‘throughout the construction of the Works ; not depasit any material or debris upon any Clty: roads throughout The construction of the Works and the City | may forthwith remove any material or debris deposited upon any road during the construction of the: Works at the “expense of the Developer , the costs of suc ch removal To be determined by the city Engineer and in the event that any claim by the City for the “removal of such material or debris shall remain unpaid after thlety (30) days of receipt of same by the Developer, the City may deduct the amount of {ts claim from the deposit referred to’ in Section 7 hereot ; provide a letter of undertaking: from a Professiona| Engineer, satisfactory to The: Developer and the City, stating: Cte that the Eng tnaer has” been retained To. ‘provide on= “site inspection rough a person qualified and exper i enced iy the inspection of municipal works .under the Engineer's direction; an othe ame of the person or “persons who wi PLE a. be involved in the inspection ; ; and ChED) that the Engineer: js famt iar with the design and specifications and accepts the. responsibi ty ‘of determining the Contractor is carrying out the: Works in accordance with thi Agreement, of certifying progress payments di vided according to. othe five parts of the Works set out in Section 3, and oft ie SLES ANS