set Ts 4 ered | ‘ahi eubpaiet Ieee al ited f PEMA seed To improve the conditions in the lane hetween Elgin and McAllister the following should be done: install a mast arm light on an existing hydro pole at the terminus of the east/west lane (see attached sketch for location) inform the owner of the building at the corner of the lane to paint the concrete abutment periodically so as it is visible at all times inform the owner's of the garbage dumpster's that they are to be on Private property and not in the lane allowance For the section of lane between Kingsway and Elgin: Option Option 1: 6 signs at $100 each = $600 Say $1000 NO post barricades @ $150 each $600 Signs at $100 each $300 Say 000 relocate 3 hydro poles @ $3500 $10500 reconstruct lane complete with pavement, base, etc. $4006 subtotal $14,500 15% contingencies $2175 * Total $16,675 *NOTE: The purchase price of the land acquisition was not included in the total, For the section of lane between Elgin and McAllister: - install mast arm light Sll/month rental t,. _k~ Ile De Boer Project/Traffic Technician