pont Se t ith " ? | To Improve the conditions in the lane between Elgin and McAllister the following should be done: install a mast arm light on an existing hydro pole at the terminus of the east/west lane (see attached sketch for location) - inform the owner of the building at the corner of the lane to paint the concrete abutment periodically so as it is visible at al] times - inform the owner's of the garbage dumpster's that they are to be On private property and not in the lane allowance COSTS: For the section of lane between Kingsway and Elgin: Option l 6 signs at $100 each = $600 Say $1000 Option 2 No post barricades @ $150 each $600 signs at $100 each $300 000 Option 3: - relocate 3 hydro poles @ $3500 $10500 ~ reconstruct lane complete with oo - pavement, base, etc. | ~—~$4000 subtotal $14,509 135% contingencies © $2175 - | | * Total $16,675. "NOTE: The purchase price of the land acquisition was not» included in the total, . . he For the section of lane between Elgin and McAllister: install mast arm light Sll/month rental . | 4, ) k~ Ike De Boer Project/Traffic Technician