March 30, 1992/091 Prior to the question being called on the foregoing resolution. Moved by Alderman Thompson: Seconded by Alderman Wright: That the report from the City Engineer dated March 25th, 1992 regarding Designation of One-way Lane located east of Shaughnessy Street between Elgin and Kingsway be referred to the Public Works Committee for further consideration. Carried. Aldermen Gordon, Keryluk and Talbot voted against the resolution. From the City Engineer, March 25, 1992 regarding the Proposed Catch Basin Installation Located at 1817 Fraser Avenue. Moved by Alderman Keryluk: Seconded by Alderman Talbot: ‘That Council approve the installation of a catch basin in front of 1817 Fraser Avenue at an estimated cost of $3,000. And That $3,000 be allocated from the Special Public Works Capital Reserve Fund for this purpose. Carried .From the City Engineer, March 26, 1992 regarding Purchase of a Tandem Axle Garbage Packer - 1992 Equipment Replacement Program. Moved by Alderman Keryluk: Seconded by Alderman Talbot: That the supply of a 1992 Tandem Axle Garbage Packer be awarded to Trican Machinery at the tendered price of $127,701.30. | That $127,701.30 be allocated from the 1992 Public Works Equi pment Reserve Fund. Carried. From the City Engineer, March 27th, 1992 regarding Subsurface Drainage Project on Sidewalk at 1600 and 1800 Mary Hill Road. | Moved by Alderman Keryluk: Seconded by Alderman Talbot: That Council approve the installation of a subsurface drain along the east side of the existing sidewalk at the 1600 & 1800 blocks of Mary Hill Road at an estimated cost of $14,500.