PUBLIC WORKS/ TRADES CAPITAL ITEMS DESCRIPTION JUSTIFICATION ESTIMATED COST Addition of street light to illuminate crosswalk @ Wellington and Prairie Safety Railing over Smiling Creek culvert Small tools and accessories for public Works and trades crews Emergency generator Modification Muick change assembly for backhoes 6000 lb tilt trailer Replacment of delapidated culverts in N.E, Sector a. E. end Laurier b. Prairie E. of Burns C. 2820 Burns Drainage works in Lane East of rewberry mort! of Fraser This intersection is poorly light @ nicht. Reports of near hits have been received, Request from P.T.A. Leigh Elementary, Existing no post guarc-rails above culvert inadequate to offer some Protection for pedestrian. This is particularly serious at night. Purchase or replacement of many small tools which wear out Or break during the year. Modify existing emergency generator to provide power source for small tools (110/220 volts), Presently City rents small generator for approximately $1,300 per year, Allows operators to inter-change digging, clean-out and hoe-pac attachments quickly to reduce crew stand-by tine, Require to haul asphalt roller/ compactor for asphalt Patching Crew, @Xist trailer beyond economical repairs. For the past several] ears, Council has approved 20,006 for the gradual repairs and reolacement of culverts in the N.E. Sector of the City. There is a low Spot in the cravel section of this lane which turns into mud during rainy pericd. addition of C.B. with long lead to Coquitlam Avenue storm sewer 1s proposed, al $ 5,500 2,000