(if insufficient space please attach a clearly marked schedule) After the deposit of the soil on the property the following measures will be taken . stabilize, reclaim, landscape, and restore the property: (if insufficient space please attach a clearly marked schedule) The following measures will be taken to prevent soil spillage and tracking onto the City’s Streets and roads, and to clean the sarne: The following measures will be taken to protect and to keep clear arid clean of all sediment, silt, leaching or other fouling or obstruction of wells, natural watercourses, septic fields, water works, sewers, and other utilities, drains, ditches, culverts, catch basins and other public works: (if insufficient space please attach a clearly marked schedule) 18. Ifthe volume of soil to be deposited exceeds 100 cubic metres there is also attached to this application a report certified by a professional engineer that the soil to be deposited is not contaminated. PAGE | 64