THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM TO Kirk, Administrator FROM: ; hong, P. Eng., City Engineer SUBJECT: Wheelchair Letdown at 2973 Coast Meridian Road (Public Works Committee Meeting March 22, 1988) Recommendation: That a wheelchair ramp be installed at the end of the Sidewalk in front of 2973 Coast Meridian Road at an estimated cost of $250 and that the associated costs be funded from the 1988 Public Works Capital Budget. Backaround and Comments: The attached letter from the B.C. Coalition of the Disabled dated February 26, 1988 was considered by the Public Works Committee. The existing field conditions render the suggested options of either extending the sidewalk to the south or straightening the asphalt curb parallel with the sidewalk to be not feasible at this time. In both these cases fill would have to be deposited along the boulevard to such a height tha the slope embankment will encroach upon private property j located at 2959 Coast Meridian. The Committee did support the request to install a wheelchair ramp near the end of the sidewalk in front of 2973 Coast Meridian however. The estimated cost for this work is $250. The Committee considered this to be another 1988 Public Works Capital Project. T.M. Chong, City Engineer City Treasurer's Comments: | certify that funds are available in the 198 Public Works Cap | Budget to cover the proposed work stat- in the recommenda G Koka: J. Mafttand, City Treasurer TMC: dh attachment Main. T-MAR/88(70)